Mullet Bay, St. maarten
Piling, waste water treatment plant and water distribution for Fourteen towers at Mullet Bay
Phase one: on October 2019, Exofor conducted piling work, utilizing micro piles to strengthen the structural foundation of Tower 1 within the fourteen-tower project. Phase two: On May 2021, Exofor provided and installed a wastewater treatment plant serving both towers, utilizing MBBR technology with a capacity of 90m³/day. Phase three: Exowater installed a distribution system for both towers, featuring pressure reducers for 160 apartments and individual pump systems for penthouses. Controlled by soft start panels and pressure tanks.
Project Information
Client:
Fourteen Towers, Mullet bay
Location:
Mullet Bay, St. Maarten
Date:
2019 & 2021